2018-S19 / WaveWalker Site Support II

Project Type Site Support / Design & Engineering / Mobilisation
Date 07.2018
Client Longitude Engineering / Prysmian Powerlink Services
Location United Kingdom, Falmouth / A&P Falmouth Shipyard

The second phase of the project was carried out in a different location than the first (the first phase can be checked here). The scope of the project was also different – it was more a continuation of unfinished works from the first phase.

The second phase was mainly limited for us to supervising the installation of the foundations and seafastenings designed by us during the first phase.

Services we provided on this project:

  • on-site supervising
  • on-site quality control of installation works
  • liaising with the owner and yard
Ship’s name WaveWalker
Ship’s type Walking Platform
Length OA 33 m
Breadth/ Width 32 m
Class BV

Interested in cooperation? Check out our Services.