2018-S17 / WaveWalker Site Support

Project Type Site Support / Design & Engineering / Mobilisation
Date 05.2018
Client Longitude Engineering / Prysmian Powerlink Services
Location Northern Ireland, Belfast / Harlan & Wolff

The first phase of the two-phase project (the second phase you can find here) during which the WaveWalker platform was adapted specified scope of submarine cable services.

One of the biggest challenges on this project the design of cable chute foundation. The problem here was to keep it as much external as possible and fit into small spaces below the stud jacks.

Services we provided on this project:

  • on-site supervising and project management
  • on-site surveys and quality control of fabrication and installation works
  • liaising with the owner, class, yard and subcontractors
  • engineering of steel structures, foundations and seafastenings
  • preparation of engineering and workshop documentation
Ship’s name WaveWalker
Ship’s type Dredger
Length OA 33 m
Breadth/ Width 32 m
Class BV